Filtro Noticias
Search filter

FCC Industrial completes the burying of the high-voltage line in Las Tablas de Daimiel National Park (Ciudad Real)

17/12/2018

FCC Industrial completes the burying of the high-voltage line in Las Tablas de Daimiel National Park (Ciudad Real)

FCC Industrial completes the burying of the high-voltage line in Las Tablas de Daimiel National Park (Ciudad Real)

FCC Industrial completes the burying of the high-voltage line in the Las Tablas de Daimiel National Park (Ciudad Real). The power line of 15 kilowatts was located in a site included in the extension of the park in 2014 and lacked any prevention device for birds.

FCC Industrial has developed this strategic contract that will improve the bird habitat of Las Tablas de Daimiel. The power line crossed the Tablas de Daimiel and was extremely dangerous for birds. It was located in the Dehesa del Quinto de la Torre, a place acquired by the Autonomous National Parks Agency in November 2011 and thanks to the environmental wealth that it holds, it was part of the extension of the wetland approved by the Council of Ministers on the 10th. January 2014.