FCC Filtro Noticias
Search filter

FCC Industrial begins lifting the LNG tank roof in Finland

22/12/2014

FCC Industrial begins lifting the LNG tank roof in Finland

  • Building a Liquefied Natural Gas terminal in Pori
  • Completion of construction phase and commencement of roof placement
FCC Industrial begins lifting the LNG tank roof in Finland

FCC Industrial, who was awarded the (EPC or "turnkey") construction contract of a 30,000 m3 LNG storage tank in Pori, Finland, for the Finnish operator Skangass OY, has finished the construction phase of the outer wall of the tank, moving on to start the lifting and placement of the tank roof, to subsequently continue with the manufacturing of the inner wall, made of steel with 9% nickel.

In terms of advancement of the work, 26% of the total development has been reached, meaning that client handover is predicted for the end of 2016.

Available languages:

ca_ES en_US es_ES