Expansion of the GNL terminal Quintero (Chile)
Design and construction of the LNG terminal expansion project. This project enables an increase of 50% in the capacity of the Terminal to inject natural gas into the gas pipeline network, reaching 15 million m³ / day. In addition, it doubles the capacity to load LNG in tankers, reaching 2,500 cubic meters a day.
LNG Barcelona storage plants (Spain)
Construction of four tanks, with a capacity of 150,000 m³, of the total containment type of double wall with cryogenic concrete and design temperature -170ºC
Fuel storage and distribution facilities at Dublin Airport (Ireland)
EPC contract (Engineering, Procurement and Construction) for the construction of three double-walled Jet A1 tanks of 5,000 cubic meters of capacity each and six kilometers of pipeline and 78 hydrants.
LNG storage plants Musel, Gijón (Spain)
Construction of two tanks, with a capacity of 150,000 m³, of the total containment type of double wall with cryogenic concrete and design temperature -170ºC.
LNG storage tank Pöri (Finland)
Design, construction, commissioning of a tank, with a capacity of 30,000 m³, of the total containment type of double wall with cryogenic concrete and design temperature -170ºC.
Solar thermal plants and photovoltaic plants (Spain)
Design, construction, commissioning, operation and maintenance of two solar thermal plants: Guzmán and Villena. Both have a nominal installed power of 50 MW each and an aggregate production of 190 GW / year.
Design, construction, start-up, operation and maintenance of two photovoltaic plants: Sierrasita and Cortijo Viejo. Both photovoltaic parks have a nominal power of 10 MW and produce a total energy of 33 GW / year.